Rose’s Wrist Warmers from BBC’s Doctor Who, The Uncharted Version
Materials: 2 balls Peru DK Luxury Alpaca (80% merino, 20% alpaca, 10% silk) , 200 yards
Set of 4 DPNs, US size 4, or 36" circular needle (for magic loop, if preferred)
cable needle, tapestry needle for weaving in ends
Gauge: 20 sts stockinette in the round = 3 inches
Directions:
Cast on 52 stitches. Work 8 rows of *K2, P2* ribbing. Start Diamond Cable Pattern on row 4.
If working on DPNs, at this point redistribute your stitches so that needle 1 has 21 sts (this will hold the
diamond motif), needle 2 has 15 sts, and needle 3 has 16 sts. The Diamond Cable Pattern will continue on to needle 2, then work in stockinette stitch until there are 7 stitches left on needle 3, and work columns 1-7. You may wish to place a stitch marker on needle three to remind you where to begin the chart.
If working with the magic loop, you will want 28 sts on the front needle, and 24 on the back. The front will hold the diamond motif and one side twist. The back needle will hold the stockinette portion and the other side twist. Work until you reach row 8 of the third complete diamond. On this round, you will place the stitch markers for your thumb gusset.
Diamond Cable Pattern:
Row1: p1, slip 2 st to cable needle, hold to front, p1, k2 from cn, *p1, k1* x6, p1, slip 1st to cn, hold to back, k2, p1 from cn, p1, k6, p1, k until 7 stitches remain, p1, k6
Row 2: p2, slip 2 st to cable needle, hold to front, p1, k2 from cn, *p1, k1* x5, p1, slip 1st to cn, hold to back, k2, p1 from cn, p2, k6, p1, k until 7 stitches remain, p1, k6
Row 3: p3, slip 2 st to cable needle, hold to front, p1, k2 from cn, *p1, k1* x4, p1, slip 1st to cn, hold to back, k2, p1 from cn, p3, c6f (slip 3 st to cn, hold to front, k3, k3 from cn), p1, k until 7 stitches remain, p1, c6f
Row 4: p4, slip 2 st to cable needle, hold to front, p1, k2 from cn, *p1, k1* x3, p1, slip 1st to cn, hold to back, k2, p1 from cn, p4, k6, p1, k until 7 stitches remain, p1, k6
Row 5: p5, slip 2 st to cable needle, hold to front, p1, k2 from cn, *p1, k1* x2, p1, slip 1st to cn, hold to back, k2, p1 from cn, p5, k6, p1, k until 7 stitches remain, p1, k6
Row 6: p6, slip 2 st to cable needle, hold to front, p1, k2 from cn, p1, k1, p1, slip 1st to cn, hold to back, k2, p1 from cn, p6, c6f (slip 3 st to cn, hold to front, k3, k3 from cn), p1, k until 7 stitches remain, p1, c6f
Row 7: p7, slip 2 st to cable needle, hold to front, p1, k2 from cn, p1, slip 1st to cn, hold to back, k2, p1 from cn, p7, k6, p1, k until 7 stitches remain, p1, k6
Row 8: p8, slip 3st to cn, hold to front, k2, slip last st from cn to left needle, k1 then k2 from cn, p8, k6, p1, k until 7 stitches remain, p1, k6
Row 9: p7, slip 1st to cn, hold to back, k2, p1 from cn, k1, slip 2 st to cable needle, hold to front, p1, k2 from cn, p7, c6f, p1, k until 7 stitches remain, p1, c6f
Row 10: p6, slip 1st to cn, hold to back, k2, p1 from cn, k1, p1, k1, slip 2 st to cable needle, hold to front, p1, k2 from cn, p6, k6, p1, k until 7 stitches remain, p1, k6
Row 11: p5, slip 1st to cn, hold to back, k2, p1 from cn, *k1, p1* x2, k1, slip 2 st to cable needle, hold to front, p1, k2 from cn, p5, k6, p1, k until 7 stitches remain, p1, k6
Row 12: p4, slip 1st to cn, hold to back, k2, p1 from cn, *k1, p1* x3, k1, slip 2 st to cable needle, hold to front, p1, k2 from cn, p4, c6f, p1, k until 7 stitches remain, p1, c6f
Row 13: p3, slip 1st to cn, hold to back, k2, p1 from cn, *k1, p1* x4, k1, slip 2 st to cable needle, hold to front, p1, k2 from cn, p3, k6, p1, k until 7 stitches remain, p1, k6
Row 14: p2, slip 1st to cn, hold to back, k2, p1 from cn, *k1, p1* x5, k1, slip 2 st to cable needle, hold to front, p1, k2 from cn, p2, k6, p1, k until 7 stitches remain, p1, k6
Row 15: p1, slip 1st to cn, hold to back, k2, p1 from cn, *k1, p1* x6, k1, slip 2 st to cable needle, hold to front, p1, k2 from cn, p1, c6f, p1, k until 7 stitches remain, p1, c6f
Repeat these 15 rows until you have 3 complete diamond patterns on your work, ending on row 8.
Right glove: Work 2 knit stitches past the first twist cable (start counting after the purl stitch that precedes the stockinette section which is the back of your wrist warmer), pm, K2, pm. Finish round.
Left glove: Work until 4 stst stitches remain before the second twist cable begins again on needle 3/back needle, pm, k2, pm, k2. Finish round.
Start working thumb gusset:
Row 1: Knit to first marker, slip marker, M1 by knitting into the stitch below, K to second marker, M1, slip
marker.
Row 2: Knit around.
Continue working in this way until you have 16 stitches between the markers. (This will take an entire
diamond repeat on the chart. You will now have 4 complete diamonds).
On next round, knit until stitch before first marker, and M1. Knit next stitch; remove marker. Slip first stitch
onto right needle.
Place 14 sts on waste yarn. Place slipped stitch back onto left needle and k2tog.
Continue knitting in pattern until you reach desired length. (I finished mine on row 13.) You may wish to
add a K1,P1 ribbing on the palm side in place of stockinette stitch at this point to avoid curling, though this
is a personal preference.
BO in pattern: (Note: This includes the seed stich pattern! If you knit the stitches as you see them within
the diamond, you will get a K1,P1 ribbing. Work them opposite as you see them to maintain a clean finish
in seed stitch.) Weave in ends.
Work thumb:
Pick up the stitches from the waste yarn, making sure to pick up 2 extra stitches in the gap to close the gap. K 6
rounds, or to your preference. Bind off, weave in ends. You may block them if you wish, but please check
to see what is the best method for the yarn you choose.
Pattern Copyright 2006 Christina Slattery
Cable chart transcribed by Jocelyn, who prefers to read the pattern line by line.